欢迎您进入山东兰天篷膜安装工程有限公司 在线留言 联系我们

服务咨询热线

15064156568

热门关键词: 移动推拉篷 钢化玻璃和钢结构 固定停车篷

行业新闻

首页>>新闻资讯>>行业新闻关于推拉棚的安装步骤介绍
联系我们
山东兰天篷膜安装工程有限公司

联系人:张经理

电话:15064156568

网址:https://www.lantianpengmo.com

地址:山东省济南市市中区建设路99-5号一层东户

关于推拉棚的安装步骤介绍

来源:https://www.lantianpengmo.com/ 日期:2022-09-17 发布人:
推拉棚安装中我们需要注意那些步骤与注意细节?济南推拉棚厂家的小编来给大家分享一下。
What steps and details should we pay attention to during the installation of the sliding shed? Jinan push-pull shed manufacturer's small editor to share with you.
一.主架安装说明:
1、 Main frame installation instructions:
主架有两种,一种是主架分半,另一种是主架是一整体的,主架是一整体的就不需要理会了,那来说说主架分半的:
There are two kinds of main shelves. One is that the main shelf is divided into two parts, and the other is that the main shelf is integrated. If the main shelf is integrated, you don't need to pay attention to it. Let's talk about the main shelf divided into two parts:
看主架横梁有没有剪刀架;无伸缩剪刀架,无需理会;有伸缩剪刀架,需要把分半主架拼接,拼接时注意:主架一半横梁是螺杆,一半横梁是伸缩圈,在拼接的时候,一个主架一半是螺杆,一半是伸缩圈;(注意:不能一个主架全是螺杆,一个主架全是伸缩圈),在主架拼接中间厂家会匹配螺丝作为固定。
Check whether the beam of the main frame has a scissors frame; No telescopic scissors stand, no need to pay attention; There is a telescopic scissor frame, so it is necessary to splice the main frame in half. During splicing, attention should be paid to: half of the crossbeam of the main frame is a screw, and half of the crossbeam is a telescopic ring. During splicing, one main frame is half a screw, and half is a telescopic ring; (Note: One main frame cannot be all screws, and one main frame can be all expansion rings). The manufacturer will match screws for fixation in the middle of main frame splicing.
二.立柱安装说明:
2、 Column installation instructions:
主架部分生产制作时就弄好了,就来开始立柱了,立柱一般我们是完整的,有些比较长尺寸的产品,我们的立柱也会分开,这个连接起来就简单一些,我们只需要参考立柱前半部分伸缩剪刀架方向,后面都是一致的;弄好之后,我们把立柱竖起来,一边一个人扶住立柱,立柱竖起来,需要找一根横条第三人就可以把主架插在两边的立柱上了。
When the main frame is produced, it is ready to start the column. Generally, we are complete with columns. For some products of relatively long size, our columns will also be separated. This connection is simpler. We only need to refer to the direction of the telescopic scissors frame in the front half of the column, and the rear is consistent; After that, we will erect the column. One person will hold the column, and the column will be erected. A third person needs to find a horizontal bar to insert the main frame onto the columns on both sides.
三.顶部安装说明:
3、 Top installation instructions:
主架和立柱都安装好了,现在就开始来上顶篷布了;把打包好的顶部篷布拆开,打开,找出推拉棚篷布的长、宽;上顶部时,需从长的左右反向上,不可从宽的前后上,避免上顶部时出现人员不注意,推拉棚往前后倾斜,发生意外,二节约后期费力费时间;顶部篷布完整搭好后,撑开立柱,在顶部与横梁中滴上生产部配的胶水,如果侧面有围布那么先不要固定侧面下垂的布料;没有就围布,立柱上部分侧面有蝴蝶螺丝,用蝴蝶螺丝固定顶部下垂篷布。
The main frame and column have been installed, and the tarpaulin is now ready; Disassemble the packed top tarpaulin, open it, and find out the length and width of the sliding tarpaulin; When climbing the top, it is necessary to move from the left to the right in a long direction, not from the front to the back in a wide direction, so as to avoid carelessness when climbing the top, and to push and pull the shed forward and backward, which may cause accidents; After the top tarpaulin is completely erected, the column shall be stretched, and the glue prepared by the production department shall be applied to the top and the beam. If there is a shroud on the side, do not fix the hanging cloth on the side first; If there is no surrounding cloth, there are butterfly screws on the upper side of the column, and the top drooping tarpaulin is fixed with butterfly screws.
四.四周围布安装说明(没有四周围布的客户,可以忽略):
4、 Installation instructions for surrounding cloth (customers without surrounding cloth can ignore):
长两侧的围布:从一个立柱上部分蝴蝶螺丝固定,边固定侧面,现在也可以固定顶部下垂布料,方式是里面是围布,外面是顶部,这样下雨了,雨水会随着顶部布料,流向侧面围布,顺着到地面,注:不可顶部下垂布料在里面,围布在外面。
Surrounding cloth on both sides of the long column: fix it with butterfly screws on the upper part of a column, and fix the side at the same time. Now you can also fix the hanging cloth on the top. The way is that the inside is the surrounding cloth, and the outside is the top. When it rains, the rain will flow with the top cloth to the side surrounding cloth, and along the ground. Note: The hanging cloth on the top cannot be inside, but the surrounding cloth is outside.

济南推拉棚

宽两面的围布:宽面的安装围布有两种,一种是前围是分开的,一种是后围是一整块的;分开的主架的两边是有一个圈圈螺帽的,生产部会配好花篮螺栓与钢丝绳,用来支撑前后围,现在可以挂围布了,围布我们相隔40公分到50公分会有一个扣眼,一个一个挂上就好了,如果是后围是一整块的,和前围的安装方法是一样的,zui后一步就是把两边的围布和立柱链接起来,我们会配胶水,粘接在一起就好了。
Wide two side shroud: there are two kinds of wide side installation shroud, one is that the front shroud is separated, the other is that the back shroud is a whole piece; There is a ring nut on both sides of the separated main frame. The production department will provide basket bolts and steel wire ropes to support the front and rear walls. Now we can hang the shroud. We will have a buttonhole at a distance of 40 cm to 50 cm. If the rear wall is a whole block, the installation method is the same as that of the front wall. Zui will link the shroud on both sides with the column next step, and we will prepare glue, Just glue it together.
五.固定安装说明:
5、 Fixed installation instructions:
现在推拉棚整个都已经组装好了,也可以使用了,在使用前,做一下固定,让推拉棚在使用期间寿命更久一些,基本固定有两种:一种是轮子固定,我们会配链条与顶爆螺丝,在轮子部位与地面做一个固定;还有一种就是,拉钢丝绳,在推拉棚前后四个方向做好一个拉绳的固定,这样在大风来临的时候,可以预防被大风吹跑;还有一些其他的固定,这个就看推拉棚的特殊,会有一些特殊的固定。
Now the whole sliding shed has been assembled and can also be used. Before use, fix it to make the sliding shed have a longer service life. There are basically two kinds of fixing: one is wheel fixing. We will provide chains and top blasting screws to fix the wheel with the ground; Another way is to pull the wire rope and fix it in four directions before and after the sliding shed, so that when the wind comes, it can prevent it from being blown away by the wind; There are also some other fixation, which depends on the special features of the sliding shed. There will be some special fixation.
此外推拉棚因为在户外受风轻轻吹日晒淋雨,为了更好地增加使用寿命,须对电动推拉棚开展恰当的维护保养和防护。以上就是济南推拉棚的安装步骤分享,感谢浏览,如果你有需要,欢迎来我们网站https://www.lantianpengmo.com进行咨询!
In addition, because the push-pull shed is exposed to the wind, sun and rain, proper maintenance and safety protection must be carried out for the electric push-pull shed in order to better increase its service life. The above is the installation steps of Jinan push-pull shed. Thank you for browsing. If you need, please come to our website https://www.lantianpengmo.com Consult!
此文关键词:Array  Array  Array  Array  

阅读/ Recommended reading

  材料:钢材、膜材料、亚克力板、水泥砂浆、透水砖等。钢材的选择上,可以使用10cm10cm的方管作为承重钢柱,4cm8cm的方管作为梁。车棚的顶部可以选择膜结构,这样可以增加车棚...

日常使用中怎么样才能保护好膜结构停车棚 2024-10-18
济南遮阳蓬:遮阳蓬的材料都有什么类型? 2024-09-02
济南遮阳蓬:家里遮阳篷不要随便安,这4点一定要留意 2024-08-27
济南停车棚:停车棚膜结构材料有哪些? 2024-08-26

鲁公网安备 37010302000864号