欢迎您进入山东兰天篷膜安装工程有限公司 在线留言 联系我们

服务咨询热线

15064156568

热门关键词: 移动推拉篷 钢化玻璃和钢结构 固定停车篷

公司新闻

首页>>新闻资讯>>公司新闻雨棚的具体制作方法从十个方面了解
联系我们
山东兰天篷膜安装工程有限公司

联系人:张经理

电话:15064156568

网址:https://www.lantianpengmo.com

地址:山东省济南市市中区建设路99-5号一层东户

雨棚的具体制作方法从十个方面了解

来源:https://www.lantianpengmo.com/ 日期:2022-10-19 发布人:
济南雨棚通常是建于建筑物入口或阳台之上,用于防雨或防止高空坠物的建筑设备。那么它的具体制作方法有哪些呢?本篇文章我们就从十个方面,为大家做一下阐述,希望对于各位的认识和理解有所帮助!
The canopy in Jinan is usually built on the entrance or balcony of a building to prevent rain or falling objects. What are the specific production methods? In this article, we will elaborate from ten aspects, hoping to help you understand!
1.加工准备及下料:按施工图放样,放样时应留出焊缝收缩量和加工余量,按放样时作样板。钢结构校正、钢板预埋件和其它零件的切割钻孔和喷涂防腐涂料处理。
1. Processing preparation and blanking: setting out shall be conducted according to the construction drawing. During setting out, the weld shrinkage and processing allowance shall be reserved, and the template shall be made according to the setting out. Correction of steel structure, cutting and drilling of steel plate embedded parts and other parts, and spraying of anti-corrosion paint.
2.测量放线:根据土建标高基准线对预埋件标高中心线进行测量,检查预埋件标高偏差,左右偏差。通过整理结果,确定了预埋件分隔的调整处理方案。沿着地板外的弹出墨线,确定了预埋件的顶标高度。
2. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation datum line, and check the elevation deviation of embedded parts, left and right deviation. Through sorting out the results, the adjustment treatment scheme of embedded parts separation is determined. Determine the top mark height of embedded parts along the pop-up ink line outside the floor.
3.预埋件安装工艺:定位预埋件安装工艺,钻孔安装工艺。
3. Embedded parts installation process: positioning embedded parts installation process, drilling installation process.
4.是悬臂式安装焊接。
4. It is cantilever type installation welding.
5.校验。
5. Calibration.
6.连接受力拉索:定位拉杆的基准线,标高线,按要求安装预埋件,焊接护栏。
6. Connecting stressed cables: locate the reference line and elevation line of the pull rod, install the embedded parts as required, and weld the guardrail.
济南雨棚
7.不锈钢玻璃爪安装焊接:按设计尺寸弹出纵横线和设计标高,用夹具夹住,点焊定位,组装完毕,焊接玻璃爪基座。
7. Installation and welding of stainless steel glass claw: snap the vertical and horizontal lines and design elevation according to the design size, clamp them with clamps, spot weld them for positioning, and weld the base of the glass claw after assembly.
8.防锈的喷漆处理工艺。
8. Anti rust painting process.
9.夹胶玻璃加工制造安装,不允许偏差大于规定偏差。
9. The deviation of laminated glass processing, manufacturing and installation shall not exceed the specified deviation.
10.调整检验:点式玻璃作整体调整检验,调整标准横平,竖直,面平。偏离不能超过规定的偏离。然后分别进行上、下打胶、修补检查、玻璃清洁、现场清理、竣工验收。
10. Adjustment inspection: point glass shall be subject to overall adjustment inspection, and the adjustment standard shall be horizontal, vertical and flat. The deviation shall not exceed the specified deviation. Then the upper and lower gluing, repair inspection, glass cleaning, site cleaning and completion acceptance shall be carried out respectively.
总而言之,雨棚是一种很有要的建筑配件,本篇文章对它的做法进行了简单的介绍,如果还想了解雨棚做法等更多的知识,还请继续关注本站https://www.lantianpengmo.com其他相关文章,希望今天的内容能给您带来帮助。
In a word, canopy is a very important building accessory. This article gives a brief introduction to its practice. If you want to know more about canopy practice, please continue to pay attention to this site https://www.lantianpengmo.com I hope today's content can help you with other related articles.
此文关键词:Array  Array  Array  Array  

阅读/ Recommended reading

  雨棚的安装因材料、设计、尺寸、安装难度以及地区差异等因素而有所不同。以下是对不同材质雨棚安装的详细分析:  The installation price of a ca...

推拉蓬定制要注意什么? 2024-12-13
济南雨棚的安装要注意 2024-12-11
停车棚是一种用于停放车辆的简易式人工构筑物 2024-12-03
活动雨棚遮阳棚 2024-12-05

鲁公网安备 37010302000864号